16
2023
-
03
Demonstration of "China Speed" Shaangu EPC Indonesia Generating Sets Connected to the Grid for Power Generation in Advance
At 19:16 on May 31, in the Konawi Industrial Park, Sulawesi Province, southeast Indonesia, with the order to connect to the grid of No. unit. Steeloss has fully realized grid-connected power generation one month ahead of schedule. Shaangu interprets the "China Plan" and "China Speed" of the "Belt and Road" with high-quality and efficient projects of "first-class level and shortest cycle".
The total installed capacity of 8 generating units in the industrial park is 1060mw, and the total annual power generation can exceed 8 billion kwh, with remarkable economic benefits. At the same time, it comprehensively and effectively solves the power supply problem of the user's stainless steel and ferronickel smelting to reach the capacity or reaches the capacity, and meets the power demand of the wharf, drying plant, steelmaking plant, ironworks, air, etc. Obedian Stainless Steel Company stainless steel smelting integration project industrial park separation and public auxiliary facilities.

